Projects

77 VILLAS – SAADIYAT BEACH VILLAS PHASE 2 – ABU DHABI

  • Client: TDIC
  • Consultant: GHD GLOBAL
  • Main Contractor: AL JABER BUILDING
  • Construction Date: Dec 2015
  • Surface Area: 230,000m2

Scope of Work: MEP WORKS

Owner: TDIC

Project Manager: TURNER

Consultant: GHD GLOBAL

Contractor: AL JABER BUILDING

Status: DLP

 

Project Profile:

77 Luxury villas in the prestigious Saadiyat Island, Abu Dhabi. This is phase 2 of the previously executed and completed project of 356 villas.

The villas are of 2 types; 4 bedroom and 5 bedrooms.

The villas are laying on a coastal land with a direct sea view, and served with one community centers and accessed with one guard house.

 

AIR-CONDITIONING AND VENTILATION SYSTEM

  • 500 Nos. DX Units (Indoor and Outdoor)
  • 40 Nos. DX Package Units
  • 850 Nos. Ventilation/Exhaust Fans

 

PLUMBING WORK

  • 470 Nos. Domestic Water Heaters
  • 160 Nos. UV Sterilizers/Filtration Systems
  • 2 Nos. Swimming Pools in Community Center
  • 80 Nos. Water Meters and Related Accessories.
  • 150 Nos. VFD Controlled Booster & Transfer Pump Sets
  • High Quality Sanitary Fixtures with Accessories
  • UPVC Pipes for Drainage Systems
  • PPR & PEX Pipes for Hot and Cold Water

 

ELECTRICAL WORK

  • Power System with a Total 28MW Connected Load
  • 470 Nos. MDB, SMDB, Capacitor Bank & FDB
  • Special Earthing System that Achieves ADDC Requirements
  • Structured Cabling System (Voice/Data), Consisting of Patch Panel and Fiber Optics Cables as per Etisalat Requirements

 