77 VILLAS – SAADIYAT BEACH VILLAS PHASE 2 – ABU DHABI
- Client: TDIC
- Consultant: GHD GLOBAL
- Main Contractor: AL JABER BUILDING
- Construction Date: Dec 2015
- Surface Area: 230,000m2
Scope of Work: MEP WORKS
Owner: TDIC
Project Manager: TURNER
Consultant: GHD GLOBAL
Contractor: AL JABER BUILDING
Status: DLP
Project Profile:
77 Luxury villas in the prestigious Saadiyat Island, Abu Dhabi. This is phase 2 of the previously executed and completed project of 356 villas.
The villas are of 2 types; 4 bedroom and 5 bedrooms.
The villas are laying on a coastal land with a direct sea view, and served with one community centers and accessed with one guard house.
AIR-CONDITIONING AND VENTILATION SYSTEM
- 500 Nos. DX Units (Indoor and Outdoor)
- 40 Nos. DX Package Units
- 850 Nos. Ventilation/Exhaust Fans
PLUMBING WORK
- 470 Nos. Domestic Water Heaters
- 160 Nos. UV Sterilizers/Filtration Systems
- 2 Nos. Swimming Pools in Community Center
- 80 Nos. Water Meters and Related Accessories.
- 150 Nos. VFD Controlled Booster & Transfer Pump Sets
- High Quality Sanitary Fixtures with Accessories
- UPVC Pipes for Drainage Systems
- PPR & PEX Pipes for Hot and Cold Water
ELECTRICAL WORK
- Power System with a Total 28MW Connected Load
- 470 Nos. MDB, SMDB, Capacitor Bank & FDB
- Special Earthing System that Achieves ADDC Requirements
- Structured Cabling System (Voice/Data), Consisting of Patch Panel and Fiber Optics Cables as per Etisalat Requirements