Projects

Saadiyat Beach Villas

  • Client: TDIC

The Saadiyat project comprises of 354 luxury villas utilizing global standard master planning, cutting-edge design, and modern facilities designed with a sustainable development mandate.

SCOPE OF WORK:

Supply, Installation, Testing, Commissioning, and Maintenance.

AIR-CONDITIONING AND VENTILATION SYSTEM

  • 2,600 Nos. Ducted split units (Indoor and Outdoor)
  • 170 Nos. Package unit.
  • 354 Nos. Cassette type.

PLUMBING WORK

  • 354 Nos. GPR tanks.
  • 354 Nos. automatic filtration systems.
  • UPVC pipes for drainage systems.
  • PPR pipes for hot and cold water.
  • Electrical water heaters.
  • 354 Nos. water meters and related accessories.
  • High quality sanitary fixtures with accessories.

ELECTRICAL WORK

  • Power system with a total 56MW connected load.
  • 3870 Nos. main, sub-main & final distribution boards.
  • Special earthing system that achieves ADWEA requirements.
  • Structure cabling system (Voice/Data), consisting of patch panel, and fiber optic cables as per Etisalat requirements.
  • Video intercom, garage control, motion detectors, automatic dimming, entrance video camera, music system.

LPG SYSTEMS

  • Supply and installation of central gas system.
  • Main control panel and gas meter.
  • 492Nos. Gas cooker outlets for kitchens and external grills.
  • Gas detection system including central panels interlocking with fire alarm and fire fighting systems.
  • Control valves and gas detection systems.

Related Projects