DUBAI SOUTH MALL
- Client: EMAAR PROPERTIES & DUBAI WORLD TRADE CENTER
- Consultant: WS ATKINS & PARTNERS OVERSEAS
- Main Contractor: ARABTEC
- Construction Date: June 2020
Scope of Work: MEP WORKS
Owner: EMAAR PROPERTIES & DUBAI WORLD TRADE CENTER
Consultant: WS ATKINS & PARTNERS OVERSEAS
Contractor: ARABTEC
Status: UNDER EXECUTION
Project Profile
The mall will have a built up area of approximately 83,000 sqm, comprising a ground level consisting of a grade level parking and a hypermarket, the next two levels will include food and beverage (F&B), cinema, family entertainment facility, food court, and retail shops.
The mall will be located in Dubai South, a 145 sq.km city on Dubai’s southern border that encompasses the Al Maktoum International Airport, the Expo 2020 site, and a major logistics district.
SCOPE OF WORK
MEP construction scope of works shall include supply, installation, testing & commissioning and maintenance during the warranty period and consist of but not limited to the following items.
- ELECTRICAL SYSTEM
- Central Battery system & Emergency Lighting
- Automatic gate barrier unit
- Generator set & ATS
- Capacitor Banks
- MDBs, SMDBs, and DBs
- MCC panels
- Small Power System
- Earthing / Lightning Protection System
- LV / ELV Cables
- ELV SYSTEM
- Intercom system
- Closed Circuit Television
- Fire Alarm System w/ CO Detection
- Access Control System
- Structured Cable System
- Building Management System
- Lighting Control System
- HVAC SYSTEM
- Heat Exchangers
- AHU Air Handling Units
- FCU Fan Coil Units
- Ventilation Fans
- CHW pumps
- BTU meters
- Chemical Dosing Pot
- PLUMBING SYSTEM
- Water Heater
- Cold & Hot Water Lines
- Sanitary Fixtures
- Submersible Pump
- Booster Pumps
- Grease Interceptors
- GRP Tank
- FIRE FIGHTING
- FM 200
- High velocity fire suppression system
- Foam suppression system
- Fire pumps
- Fire Hose Reel
- Pre-Action deluge.
- Valves and Accessories
- Sprinkler System