BOLLYWOOD PARKS PACKAGE - 4B
- Client: MERAAS HOLDING
- Consultant: DEC
- Main Contractor: AL NASR
- Construction Date: Dec 2016
Scope of Work: MEP WORKS
Owner: MERAAS HOLDING
Project Manager: SAMSUNG C&T
Consultant: DEC
Contractor: AL NASR
Status: DLP
Project Profile
This project is comprised of 3 buildings namely, Entry Facility, Rock On and Bollywood Blvd West covering a total area of 5,250 sq.m.
SCOPE OF WORK
MEP construction scope of works shall include supply, installation, testing & commissioning and maintenance during the warranty period and consist of but not limited to the following items.
- ELECTRICAL SYSTEM
- LV Switchboards (MDB, SMDB, MCC, FDB and Capacitor Bank)
- Light Fixtures
- Wiring Accessories and Isolators
- Cable Trays and Trunking
- UPS Units
- Earthing and Lighting Protection System
- Cables and Wires
- UPVC Ducts, PVC Containment and Accessories
- ELV SYSTEM
- Access Control System
- Lighting Control
- Central Battery System
- Structured Cabling System
- Fire Alarm with Voice Evacuation System
- HVAC SYSTEM
- AC Equipment (FAHU, AHU and FCU)
- Ducts and Accessories
- Air Outlets
- Chilled Water Pipes along with Insulation Fittings and Accessories
- Valves and Accessories
- Starter Panels for HVAC Equipment
- Ventilation Fans
- Vibration Isolators
- Condensate Drain for
- Building Management System
- Wild Air Works
- PLUMBING SYSTEM
- UPVC Pipes for Drainage System
- PPR pipes for Hot Water and Cold Water Supply
- Submersible and Circulation Pumps
- Valves and Accessories
- Pipe Insulation and Supports
- Polyethylene Water Tank
- Drainage Accessories
- Sanitary Fixtures, Mixers and Fittings
- Compressed Air System
- FIRE FIGHTING SYSTEM
- Fire Suppression System
- Black Steel Pipes, Fittings and Accessories
- Valves and Accessories
- Sprinkler System
- Fire Hose Reel Cabinets
- Fire Extinguishers