Projects

BOLLYWOOD PARKS PACKAGE - 4B

  • Client: MERAAS HOLDING
  • Consultant: DEC
  • Main Contractor: AL NASR
  • Construction Date: Dec 2016

Scope of Work: MEP WORKS

Owner: MERAAS HOLDING

Project Manager: SAMSUNG C&T

Consultant: DEC

Contractor: AL NASR

Status: DLP

Project Profile

This project is comprised of 3 buildings namely, Entry Facility, Rock On and Bollywood Blvd West covering a total area of 5,250 sq.m.

SCOPE OF WORK

MEP construction scope of works shall include supply, installation, testing & commissioning and maintenance during the warranty period and consist of but not limited to the following items.

 

  1. ELECTRICAL SYSTEM
  • LV Switchboards (MDB, SMDB, MCC, FDB and Capacitor Bank)
  • Light Fixtures
  • Wiring Accessories and Isolators
  • Cable Trays and Trunking
  • UPS Units
  • Earthing and Lighting Protection System
  • Cables and Wires
  • UPVC Ducts, PVC Containment and Accessories

 

  1. ELV SYSTEM
  • Access Control System
  • Lighting Control
  • Central Battery System
  • Structured Cabling System
  • Fire Alarm with Voice Evacuation System

 

  1. HVAC SYSTEM
  • AC Equipment (FAHU, AHU and FCU)
  • Ducts and Accessories
  • Air Outlets
  • Chilled Water Pipes along with Insulation Fittings and Accessories
  • Valves and Accessories
  • Starter Panels for HVAC Equipment
  • Ventilation Fans
  • Vibration Isolators
  • Condensate Drain for
  • Building Management System
  • Wild Air Works

 

  1. PLUMBING SYSTEM
  • UPVC Pipes for Drainage System
  • PPR pipes for Hot Water and Cold Water Supply
  • Submersible and Circulation Pumps
  • Valves and Accessories
  • Pipe Insulation and Supports
  • Polyethylene Water Tank
  • Drainage Accessories
  • Sanitary Fixtures, Mixers and Fittings
  • Compressed Air System

 

  1. FIRE FIGHTING SYSTEM
  • Fire Suppression System
  • Black Steel Pipes, Fittings and Accessories
  • Valves and Accessories
  • Sprinkler System
  • Fire Hose Reel Cabinets
  • Fire Extinguishers

 