G+2 LABOUR ACCOMMODATION BUILDING – 4 BUILDINGS
- Client: Arenco Real Estate
- Consultant: ARENCO
- Main Contractor: Robust Contracting
Scope of Work: MEP Works
Location: Dubai Investments Park, Dubai
Client: M/S Arenco Real Estate
Consultant: M/S ARENCO
Contractor: Robust Contracting
Status: Completed
Project Profile:
This project involved a district cooling system In addition to being a comprehensive MEP contract.
Scope of Work: Supply, Engineering, Installation, Testing, Commissioning, and Maintenance.
AIR-CONDITIONING AND VENTILATION SYSTEM
- 8 Nos. heat exchangers.
- 12 Nos. pumping system (secondary pumps).
- 16 Nos. FAHU and 56 Nos. AHU.
- 8 Nos. central exhaust fans.
- Connection to district cooling system.
PLUMBING AND WATER SUPPLY
- RCC U/G water tank of 160 m3 capacity.
- 8 Nos. Transfer and Booster Pump Sets.
- 4 Nos. GRP water tank 60 m3 capacity each.
- Installation of all sanitary wares and fittings.
- Plumbing and domestic water work.
FIRE-FIGHTING WORK
- UL- listed fire fighting pump sets.
- Wet and Dry risers, with sprinklers and hose reel cabinets.
- Fire alarm system.
ELECTRICAL WORK
- Power system with a total of 1.8 MW total connected load.
- 9 Nos. MDB, 12 Nos. SMDB and 24 Nos. FDB.
- All related power and lighting cabling.
- ELV Systems: SMATV, CCTV, and Public Address systems.