Projects

THE FORTE TOWERS - D1 D2

  • Client: EMAAR
  • Consultant: AECOM
  • Main Contractor: TARGET ENGINEERING
  • Construction Date: Jan 2019
  • Surface Area: 214,000m2

Scope of Work: MEP WORKS

Owner: EMAAR

Consultant: AECOM

Contractor: TARGET ENGINEERING

Status: Under Execution

Project Profile

Situated in Dubai's new cultural centre, Forte is a two-tower residential development, set apart by its distinctive location and aesthetic architecture which adds to the ambiance of The Opera District. The apartments overlook the iconic Dubai Opera, the 2,000- seat, multi-format, performing arts centre which is the centrepiece of The Opera District and host to opera, ballet, theatre, concerts, exhibitions and sport events. 

The apartments offer direct views of Dubai Opera, the lively Opera Plaza and The Dubai Fountain.

The Project consist of 2 Towers named D1 & D2:

  1. D1 Tower – 67 floors – Total area – 84,576 m2
  2. D2 Tower – 38 floors – Total area – 41,716 m2

The towers have in common 5 basements, 1 Ground floor and 6 podium floors.

After the podium floors, D1 has 67 floors and D2 has 38 floors.

 

SCOPE OF WORK

MEP construction scope of works shall include supply, installation, testing & commissioning and maintenance during the warranty period and consist of but not limited to the following items.

 

  1. ELECTRICAL SYSTEM
  • Central Battery system & Emergency Lighting
  • Automatic gate barrier unit
  • Generator set & ATS
  • Capacitor Banks
  • MDBs, SMDBs, and DBs
  • MCC panels
  • Busbar risers
  • Small Power System
  • Earthing / Lightning Protection System
  • LV / ELV Cables

 

  1. ELV SYSTEM
  • Audio intercom system
  • Closed Circuit Television
  • Fire Alarm System
  • Access Control System
  • SCS Structured Cable System and Cabinet System
  • Fire alarm & voice evacuation system
  • Building Management System
  • Lighting Control System

 

  1. HVAC SYSTEM
  • Heat Exchangers
  • AHU Air Handling Units
  • FCU Fan Coil Units
  • Ventilation Fans
  • VAV (Variable Air Volume)
  • CAV (Constant Air Volume)
  • CHW pumps
  • BTU meters
  • Leak Detection System
  • Chemical Dosing Pot

 

  1. PLUMBING SYSTEM
  • Water Heater
  • Cold & Hot Water Lines
  • Sanitary Fixtures
  • Filtration System
  • Water Tank Cooling System
  • Booster Pumps

 

  1. FIRE FIGHTING
  • FM 200
  • High velocity fire suppression system
  • Foam suppression system
  • Fire pumps
  • Portable Extinguisher
  • Fire Hose Reel
  • Zone Control Valve, Alarm Check Valve, Pre-Action deluge.
  • Valves and Accessories
  • Sprinkler System

Related Projects