G+6 OFFICE BUILDINGS - ARENCO

  • Client: ARENCO REAL STATE
  • Consultant: ARENCO
  • Main Contractor: ROBUST CONTRACTING
  • Construction Date: Sep 2014

Scope of Work: MEP WORKS

Client: ARENCO REAL STATE

Consultant: ARENCO

Contractor: ROBUST CONTRACTING

Status: Completed

 

Project Profile:         

Located in Dubai, this project consists of 4 buildings currently under execution in 4 simultaneous phases.

 

Scope of Work: Supply, Installation, Testing, Commissioning and Maintenance.

 

AIR-CONDITIONING AND VENTILATION SYSTEM

  • 8 Nos. Heat Exchangers (6000MBH) Total Capacity
  • 6 Nos. Pumping System (Primary Pumps)
  • 8 Nos. FAHU, 112 AHU and 60 Nos. FCU
  • 32 Nos. Central Exhaust Fans

 

PLUMBING AND WATER SUPPLY

  • Water Tank, RCC U/G of 120 m3 per building.
  • O/H GRP Water Tank 30 m3 Capacity per Building
  • 8 Nos. Transfer and Booster Pump Sets
  • Sanitary Ware, Fittings and Accessories

 

FIRE-FIGHTING WORK

  • UL- Listed Fire Fighting Pump Sets
  • Wet and Dry Risers with Sprinkler and Hose Reel Cabinets

 

ELECTRICAL WORK

  • Power System with a Total of 6MW Connected Load
  • 4 Nos. Transformers, 4 Nos. MDB, 40 nos. SMDB and 130 nos. FDB.
  • IP 54 based Busbar System
  • All Related Power and Lighting Cabling
  • ELV Systems: CCTV, Paging, Lighting Control, SMATV, Lighting Control and Gate Barrier Systems