BOULEVARD HEIGHTS
- Client: EMAAR
- Consultant: GROUP CONSULT INTERNATIONAL
- Main Contractor: TARGET ENGINEERING
- Construction Date: Mar 2020
- Surface Area: 160,000m2
Scope of Work: MEP WORKS
Owner: EMAAR
Consultant: GROUP CONSULT INTERNATIONAL
Contractor: TARGET ENGINEERING
Status: Under Execution
Project Profile
The project involves construction of two residential towers spread over a total built up area of 150,000 sqm consisting 3 basements, ground floor, 3 podiums, 53 levels in Tower 1 and 47 levels in tower 2 respectively.
The amenities in the project will include residential apartments, offices, retail area/ restaurants and car parking.
SCOPE OF WORK
MEP construction scope of works shall include supply, installation, testing & commissioning and maintenance during the warranty period and consist of but not limited to the following items.
ELECTRICAL SYSTEM
- Central Battery system & Emergency Lighting
- Automatic gate barrier unit
- Capacitor Banks
- Generator Set & ATS
- MDBs, SMDBs, and DBs
- MCC panels
- Busbar Risers
- Small Power System
- Earthing / Lightning Protection System
- LV / ELV Cables
ELV SYSTEM
- Audio Intercom System
- Closed Circuit Television
- Fire Alarm System
- Access Control System
- SCS Structured Cable System and Cabinet System
- Fire alarm & Voice Evacuation System
- Building Management System
- Lighting Control System
HVAC SYSTEM
- Heat Exchangers
- AHU Air Handling Units
- FCU Fan Coil Units
- Ventilation Fans
- VAV (Variable Air Volume)
- CAV (Constant Air Volume)
- CHW Pumps
- BTU Meters
- Leak Detection System
- Chemical Dosing Pot
PLUMBING SYSTEM
- Water Heater
- Cold & Hot Water Lines
- Sanitary Fixtures
- Filtration System
- Water Tank Cooling System
- Booster Pumps
FIRE FIGHTING
- FM 200 System
- High Velocity Fire Suppression System
- Foam Suppression System
- Fire Pumps
- Portable Extinguisher
- Fire Hose Reel
- Zone Control Valve, Alarm Check Valve and Pre-Action
- Valves and Accessories
- Sprinkler System